Shortly after the mainline trackwork for the Southern Maryland Railroad was completed in March 2008, I  hosted my round-robin group meeting at my house.  Part of the planned activity was to conduct timng trials of a train over the line to arrive at a benchmark fast-clock speed for use on the entire layout.

Two complete round-trip runs were timed, each with a different engineer, and the results recorded.  At the outset I believed that  a 12:1 fast clock would be required in order to arrive at a reasonable run time over what I perceived as a relatively short layout distance.  Once the times were computed and averaged they were converted to 12:1 times. They were found to be way too long when compared to the actual time over the same route by the real-world Chesapeake Beach Railway timetable which scheduled 37 minutes between the two stations of Chesapeake Beach and Upper Marlboro.  A little recomputation determined that an 8:1 fast clock would almost exactly duplicate the 37 minute timetable schedule.


The averaged time from the trials, conversion to 8:1 times, and the small adjustments to the results to duplicate the Chesapeake Beach Railway schedule are shown in the table below.

Timing Trials - Southern Maryland Railroad

Westbound
Time
Elapsed-s
Convert 8:1 s
8:1 - m
8:1 -BtwSta
Cum. Run Times
Sample TT
Adj
Rev Sample TT
Depart - Chesapeake Beach

0




8:00

8:00










Arrive - Owings

97
776
13
13
13
8:13
+1
8:14
At Station
60s
60
480
8
8


-3

Depart - Owings






8:21

8:19










Arrive - Upper Marlboro

140
1120
19
19
40
8:40
-1
8:37










At Station
30s
30
240
4





Turn Train, Uncouple

104
832
14





Run to Engine Service

26
208
3

























Eastbound
Time








Engine Svc. to Couple Up

98
784
13





Boarding
30s
30
240
4





Depart - Upper Marlboro






5:00

5:00










Arrive - Owings

124
992
17
17
17
5:17
+1
5:18
At Station
60s
60
480
8
8


-3

Depart - Owings






5:25

5:23










Arrive - Chesapeake Beach

107
856
14
14
39
5:39

5:37











Given the serendipitous results achieved at an 8:1 fast clock setting for the Southern Maryland Railroad portion of the layout, it is currently planned to use 8:1 for the fast clock ratio on the entire layout including the much longer runs on the Solomons and Patuxent Railroad.

Back to Operations Planning